From 2012-01-30
Water level of Sevan
1900.12m
Water Count

Show archive
From
To
 
 
Completed projects

Development of Subsoil Water Drainage System of Yerevan Subway

1995-1998
“Development of Subsoil Water Drainage System at «Zoravar Andranik» Station of the Yerevan Subway” This project aimed at construction of


Spandaryan HPP. Repair-rehabilitation works of the power tunnel

1997
Spandaryan HPP. Repair-rehabilitation works of the power tunnel. Having in view the elimination of breakdown occurred somewhat around the concrete


Tunnel No.2

1968-1980
30 km long Tunnel No.2, the cross section of the main part with 3.7×3.7m size of which is arched and




 
   All rights reserved © 2008 "Arpa-Sevan" OJSC Designed & developed
by WebCenter design studio