From 2010-09-08
Water level of Sevan
1899.86m
Water Count

Show archive
From
To
 
 
Completed projects

The Complex of Hydraulic Works for Transfer of the Arpa and Yeghegis

1961-1981
The main structures of the Project include: 1. The headwork is Kechut Reservoir on


“Friendship” Station of the Yerevan Subway

1976-1981
The construction of Station was initiated in 1976 and completed in 1981. About 2 km long stretch of rock excavation


The transition structure

1978
The transition structure between the Tunnel No.1 and Tunnel No.2 of the Arpa-Sevan conduit is represented by a hydrosystem on




 
   All rights reserved © 2008 "Arpa-Sevan" OJSC Designed & developed
by WebCenter design studio