1. 3 km long Tunnel of Kadzharan Tailings Dump; 2. Pedestrian subway under the railroad at Hoketmberyan Railway Station; 3. Apartment house on Gnuni Street


Rehabilitation of Kechut Dam, construction of new spillway and installation of safety measures

2006-2007
1. The earthwork – 19482 m3. 2. Asphalt carpet – 41233 m2. 3. Concrete and reinforced concrete – 1358 m3. 4. Installation of reinforcement – 71.8


Strengthening of the left bank of the River Araks

2007-2007
The earthwork – 5210 m3. Rough walling in gabion – 13285 m3.




 