The works on the construction of a Small HPP have been carried out with due regard for seasonality on the following projects:
1. Head structures, the water intake;
2. Laying of 4.5 km long Penstock of 1420 mm;
3. Power House;
4. Installation of mechanical and power equipment;
5. Outdoor switchyard 35 kV;
6. Access roads and land development.
The following main scopes of works have been implemented:
1. The earthwork – 195124 m3.
2. Concreting and R.C.works – 5100 m3.
3. The Penstock of 1420 mm - 4501.6 m.
4. Insulation of pipeline – 19802.4 m2.
5. Installation of reinforcement and steel structures – 196.6 Ton.
The cost of works was 651540.46 thousand Dram or 1144227 $US.
The Customer: CJSCo.”Bazenk” RA
Address: Vagharsh Vagharshyan Str. 20, Yerevan City 375012,RA.