The Yerevan Central Heating-and-Power Plant

2000-2002
The Yerevan Central Heating-and-Power Plant. Repair of Reinforced Lining and Reconstruction of the Sprinkler of Cooling Tower ¹ 1.
The following main scopes of works have been implemented:
1. Shotcreting - 13312 m2.
2. Concrete and reinforced concrete – 151.2 m3.
3. Installation of reinforcement – 42.17 Ton.
4. Steel structures – 27.31 Ton.
5. Plaster work – 1520 m2.
6. Pipe laying – 140 Ton.
7. Wooden structures – 492 Ton.
8. Preparation and mounting of sprinkler units of corrugated asbestos states – 46478 m2.
The cost of works was 326132.02 thousand Dram or 597271 $US.
The Customer: Yerevan CHPP CJSCo.