Construction of DRP in Sari-Tagh region in the Yerevan City
2003-2004
Construction of DRP in Sari-Tagh region in the Yerevan City
Contract ¹ 01F4/ST DRR/001.
The works were executed in the frameworks of Municipal Development Program.
The complex of structures consists of the following main projects:
1. Banked 4000 m3 capacity Daily Regulation Pond from precast R.C.
structures with cast-in-place R.C. bottom;
2. Two rooms of absorbent-type filters with control-and-measuring
instrumentation for the control of water level in the basin;
3. Pipelines – feeding, lateral and supply ones;
4. Premises of operation services.
The following main scopes of works have been implemented:
1. The earthwork – 15753 m3.
2. Concrete and reinforced concrete – 737.8 m3.
3. Precast reinforced concrete – 244.1 m3.
4. Crushed stone – sand mattress – 562.5 m3.
5. Installation of reinforcement – 13.6 Ton.
6. Steel structures – 19.4 Ton.
7. Pipelines – 1040 m.
8. Insulation of pipelines – 888 m.
9. The flash works – 2320 m2.
10. Shotcreting – 135 m2.
11. The stone-work – 26.4 m3.
12. Roofing – 43.0 m2.
13. Communications transmission line – 1.5 km.
14. 0.4 kV transmission line – 0.47 km.
15. Asphalt carpet – 1800 m2.
16. Planting of greenery in the territory – 3900 m2.
17. Electrotechnical works.
18. The building of operation and security guard services of 32 m2 usable area.
The cost of works – 112819.28 thousand Dram or 211490 $US.
The Customer: CJSCo. “Dzhrmugh-Kojughi”.
Address: Abovyan Str.66a, the Yerevan-City, RA.