Construction Works on the Headworks of Getik SHPP on the Getik River

2011
Construction Works on the Headworks of Getik SHPP on the Getik River

The Customer was “ANDG Stile” Ltd.

Construction period was 2011 year.

The cost of construction works was 61 001 748 AMD.

The design provided for the construction of the upstream floor, flush weir, spillway apron, cushion pool, flushing basin, settling basin and the fishway.
The works include excavation works, concreting and RC works, construction of movement joints.